Installation Guide
41TriStar Meter 2 Operator’s Manual
227W DIV
50.4V 23C 4.5A
5.0Ah DIV
50.4V 23C 4.5A
Battery Voltage
Battery Voltage
Total System Diversion Current
Battery Temperature
Total System Diversion Current
Battery Temperature
Total System Diversion Watts
Total System Diversion Amp-hours
Figure 4-13. Total system diversion Operating Displays
System Manual Operation Displays
Display screens located below the Operating Displays provide
for various resets and manual functions. These commands
are broadcast across the network to all controllers. See the
Manual Operations topic in Section 4.2 for more information.
System Settings Menu
This menu displays the meter hardware and software version
and also provides adjustments for the meter language and
temperature units.