Installation Guide
10 Installation
For Systems with Two or More TriStar Controllers:
• Use a meter or MSView PC software to adjust the MeterBus
address of each TriStar controller in the system.
• Mount a local meter (TS-M-2 or TS-M-2-600V) to a TriStar,
or mount a TS-RM-2 in a remote location.
• Connect the meter(s) and controllers to a HUB-1 (sold
separately)
• Adjust the meter settings
NOTE:
A TriStar meter may be connected to each TriStar in a
multi-TriStar system without the use of a HUB-1. This
conguration will not provide total system information;
each meter will only display the information for one
controller.
NOTE:
All meters are rated for indoor use only.
There is a limit of two meters per single TriStar, or MeterBus
network. A single controller cannot power three meters.
When connected to a TriStar-PWM controller, the meter
will automatically display the correct operating mode (Solar
Charging, Load, or Diversion). No adjustments to the meter
are required.
If replacing or extending the meter cable, see Section 5.2.