Installation Guide

l P_OK: xxx of yyy: Thereisaconnectiontothepoweroptimizersandatleastonepoweroptimizeris
sendingmonitoringdata.XXXisthenumberofpoweroptimizersforwhichtelemetrieshavebeen
receivedinthelasttwohours.YYYisthenumberofpairedpoweroptimizersidentifiedduringthe
mostrecentpairingprocess.IfXXXandYYYarenotequal,theremaybeaprobleminoneormore
poweroptimizers.
l S_OK:Theconnectiontothemonitoringplatform.(Server Connectedappearsonlyiftheinverteris
connectedtothemonitoringplatform).
l Status: Theinverteroperationstatus:Off,NotPaired,NightMode,Error,Pairing,orProduction
l Switch:IndicatesthepositionoftheinverterON/OFF/Pswitch:On,Off,orPposition.
l CosPhi:Indicatestheratiobetweenactiveandreactivepower.Anegativevalueindicatesalagging
CosPhi.
Formoreinformation,refertothePowerControlApplicationNote,availableonthe
SolarEdgewebsiteathttps://www.solaredge.com/sites/default/files/application_
note_power_control_configuration.pdf.
l Limit:Theinvertermaximumoutputpower
l Country:Theselectedcountryandgridsetting
l Voltage (Vdc):TheDCinputvoltage
l Temp(°Cor°F):Theinverterheatsinktemperature
Site Status
TheSitestatusscreenshowstheaccumulatedstatusofallinvertersconnectedtoamasterinverterina
chain(bus)andthemasterinverterstatus.
Status
Site
Production
90 kW
Limit
1.00 MW
Inverters
10/10
Inverter
SN 07318000C
Power
100 kW
Voltage
277 Vac
Frequency
60.9 Hz
P_OK: 31 0f 31
Optimizers Connected
S_OK
Server Connected
Status
Production
Switch
OFF
CosPhi
1.00
Limit
Export
Country
USA2
Switch Off. Production disabled
Commissioning›
l Sitestatus:
o
Production:TheACoutputpower
Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter
-Single Phase Inverter with HD-Wave Technology Installation MAN-01-00541-1.0
39