Installation Manual

6. Recordpoweroptimizerserialnumbersandlocations,asdescribedinReportingandMonitoring
InstallationDataonpage35.
Step 2: Connecting a PV Module to a Power
Optimizer
NOTE
Images are for illustration purposes only. Refer to the label on the product to identify the plus and
minus input and output connectors.
Foreachofthepoweroptimizers:
l ConnectthePlus(+)outputconnectorofthemoduletothePlus(+)inputconnectorofthepower
optimizer.
l ConnecttheMinus(-)outputconnectorofthemoduletotheMinus(-)inputconnectorofthe
poweroptimizer.
Figure 8: Power optimizer connectors
Step 3: Connecting Power Optimizers in Strings
Youcanconstructparallelstringsofunequallength,thatis,thenumberofpower
optimizersineachstringdoesnothavetobethesame.Theminimumandmaximum
stringlengthsarespecifiedinthepoweroptimizerdatasheets.RefertotheDesignerfor
stringlengthverification.
NOTE
l Use at least 11 AWG/ 4 mm² DC cables.
l The total cable length of the string (excluding power optimizers’ cables) should not exceed
1000ft./300 m from DC+ to DC- of the inverter.
1. ConnecttheMinus(-)outputconnectorofthestring’sfirstpoweroptimizertothePlus(+)output
connectorofthestring’ssecondpoweroptimizer.
Chapter 2: Installing the Power Optimizers
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1
21