Technical information
12/01/02
HOSHIZAKI KM CUBER
SEQUENCE OF OPERATION
THE STEPS IN THE SEQUENCE ARE AS FOLLOWS:
NOTE: When power is supplied to the “E” Control board,
a 5 second delay occurs at start-up.
1. 1 Minute Fill Cycle
The unit always starts in the 1 minute fill cycle. When
power is applied to the unit the water valve is ener-
gized and the fill period begins. After 1 minute the
board checks for a closed float switch. If the float
switch is closed the harvest cycle begins. If not, the
unit will not start without adequate water in the sump.
This serves as a low water safety shut off. The water
valve will remain energized through additional 1 min-
ute cycles until water enters the sump and the float
switch closes.
2. 1st Harvest Cycle
The compressor starts, hot gas valve opens, water
valve remains open and harvest begins. As the evap-
orator warms, the thermistor located on the suction
line checks for a 48° F. temperature. When 48° F. is
reached, the harvest is turned over to the adjustable
control board defrost timer which is factory set for
normal conditions. This adjustment can vary the de-
frost timer from 1 to 3 minutes.
3. Freeze Cycle
After the timer terminates the harvest cycle, the hot
gas and water valves close, and the ice production
cycle starts. For the first 5 minutes the controller
board will not accept a signal from the float switch.
This 5 minute minimum freeze acts as a short cycle
protection. At the end of 5 minutes the float switch
assumes control. As ice builds on the evaporator the
water level in the sump lowers. Thefreeze continues
until the float switch opens and terminates ice
production.
32
12/20/03
2/20/03










