User guide

22
5. Mark the wall surface for an opening
measuring approximately 245 mm x
125 mm.
Mark the route of the incoming and
outgoing pipework services.
Using the building-in shroud as a guide
remove the plaster and brickwork/dry-
lining to the required depth of
concealment.
Note! The depth of concealment must
be such that the final wall surface (e.g.
plaster and tiles etc.) finishes on the
raised portion of the plastic building-in
shroud.
6. Mark the final position on the wall of the
two larger outer diameter fixing holes in
the flanges of the wall mounting bracket.
This bracket must be fixed at 45°.
7. Drill and suitably plug the two marked
fixing holes.
8. Thoroughly flush the incoming hot
and cold water supply pipes before
connecting the shower control.
9. Fix the shower control to the wall
mounting bracket using the two M4 x 16
mm screws provided.
10. Install the shower control aligning the
two flange holes of the wall mounting
bracket assembly with the pre-drilled
fixing holes.
Secure the shower control with the two
No. 8 x 1
1
/
4
" fixing screws supplied.
Shower Control
Wall Mounting
Bracket
125 mm
245 mm