Owner`s manual
30786-7-0415Page 58
Attention: Install blower assembly before connecting gas in-
let supply line.
Wiring
The appliance, when installed, must be electrically grounded in
accordance with local codes or, in the absence of local codes,
with the National Electrical Code, ANSI/NFPA 70, if an external
electrical source is utilized. This appliance is equipped with
a three-prong [grounding] plug for your protection against
grounded three-prong receptacle. Do not cut or remove the
grounding prong from this plug. For an ungrounded receptacle,
an adapter, which has two prongs and a wire for grounding, can be
purchased, plugged into the ungrounded receptacle and its wire
connected to the receptacle mounting screw. With this wire com-
pleting the ground, the appliance cord plug can be plugged into the
adapter and be electrically grounded.
Caution: Label all wires prior to disconnection when servic-
ing controls. Wiring errors can cause improper and dangerous
operation. Verify proper operation after servicing.
Note: Junction box is to be located in the lower compartment of
-
stallation for use with blower assembly. A standard ON/OFF
wall switch or SCV-1 variable speed control kit should be
installed to activate power to the Junction Box and provide
power for the operation of the blower assembly. It is recom-
mended that installation of the wiring be performed by a
See Figure 70.
CAUTION: ALL WIRING SHOULD BE DONE BY A QUALI-
FIED ELECTRICIAN AND SHALL BE IN COMPLIANCE WITH
ALL LOCAL, CITY AND STATE BUILDING CODES. BEFORE
MAKING THE ELECTRICAL CONNECTION, MAKE SURE
THAT MAIN POWER SUPPLY IS DISCONNECTED. THE
APPLIANCE, WHEN INSTALLED, MUST BE ELECTRICAL-
LY GROUNDED IN ACCORDANCE WITH LOCAL CODES,
WITH THE NATIONAL ELECTRICAL CODE ANSI/NFPA 70
(LATEST EDITION).
To install the blower kit or access the junction box, remove lower
A factory included junction box is located in the lower compartment
outer wrap with the clamp provided. Leave approximately 6” of
wire in the junction box for connection.
Attach black wire to one side of the receptacle and white wire to
opposite side of receptacle. The ground wire should be attached
to the green (ground) screw. See Figure 74.
Install the receptacle into the junction box as illustrated.
Attach cover plate. Place Junction Box so that it is approximately 8
to 12" away from the outer wrap wall. Secure wiring at outer wrap
Attention: If installed, do not damage gas inlet supply line when
of the gas inlet supply line may be necessary.
Figure 70
OPTIONAL FBB5 BLOWER INSTALLATION INSTRUCTIONS










