Owner`s manual
30786-7-0415 Page 17
INSTALLATION
Flush Mount Mantel Installation - See-through Models Only
(Figure 15)
hex-head screws supplied in hardware package to attach nailing
NAIL OR OTHER
SUITABLE FASTENER
FRAMING
Figure 15
Framing (See Figure 12)
place. Framing should be positioned to accommodate wall covering
constructed of 2 x 4 lumber or heavier. The framing headers may
CAUTION: MEASURE FIREPLACE DIMENSIONS AND VERIFY
FRAMING METHODS, AND WALL COVERING DETAILS BEFORE
FRAMING CONSTRUCTION BEGINS.
Framing dimension "A" (Figure 12) includes the clearance
Attention:
base.
Attention: If a base or mantel is not used and the appliance is
installed directly on carpeting, tile or other combustible material
panel extending the full width and depth of the appliance. The
vertical dimension must be adjusted when a metal or wood panel
is placed beneath the appliance.
Finishing (Figures 16 and 17)
Finish the walls with the material of your choice. Figure 3 on page 10
shows the minimum vertical and corresponding maximum horizontal
dimensions of mantels or other combustible projections above the
Only non-combustible materials may be used to cover the black
or modify the air inlet/outlet louvers in any manner.
Provide adequate clearances around air openings into the
combustion chamber.
Caution:
surround (top and sides) are sealed, a 300°F minimum sealant
material must be used. These joints are not required to be sealed.
Only non-combustible material (using 300°F minimum adhesive if
Flush Wall Installation - See Through Models
63/8”(162 mm)
OF NON-COMBUSTIBLE MATERIAL
FINISHED WALL
FRONT TRIMOR NON-
COMBUSTIBLE MA TERIAL
(INSTALLA TION IS OPTIONAL)
JOINT BETWEEN FINISHED
WALL AND UNIT SEALED
WITH 300° F, 149°CSEALANT
MATERIAL (SEALANT IS OPTIONAL)
Figure 16










