Technical data

Chapter 4: Installation
4.4 Preparing the System Wiring Diagram
Keep a copy of the system-wiring diagram with the SP40S manual as a permanent record of the system
wiring.
4.4.1 Unpacking and Taking Inventory
Carefully unpack the panel and make sure each item described on the packing slip is present and undamaged.
1. Check the exterior of the shipping container(s) for any exterior damage, then the interior of the
container(s).
2. Notify both the carrier and Cooper Wheelock immediately on the straight bill of lading (supplied by the
carrier) if any damage is found both verbally and in writing; you may also request an inspection by the
carrier. Such requests must usually be made within a specified time period from date of shipment.
Cooper Wheelock is not responsible for damage to equipment occurring during shipping, and only
furnishes replacement parts against a written purchase order. It is the customer’s responsibility to file a
claim with the carrier.
3. Follow any instructions Cooper Wheelock and/or the carrier may supply about possible damage.
4. If no damage is found, compare the contents of the Inventory List against the contents of the shipping
container(s), to ensure receipt of all components.
5. Save all shipping materials (any “bubble wrap” or plastic) for possible future use. Store in a safe, dry
location.
4.4.2 Locating the Panel
Mount the panel in a location within the environmental limits specified in the latest UL Standard 864 for
indoor/dry control panels.
DO NOT locate the panel in a hazardous area.
CAUTION: To comply with the latest NFPA and UL requirements for interconnection of fire
alarm control equipment, locate the SP40S Multi-Function Facility Communication System in
the same room, and within 20 feet of, a listed compatible fire alarm control panel. Enclose the
wiring in conduit and connect it properly to such control panel.
1. See Figure 4-2 for the panel mounting hole layout.
2. Mark and drill mounting holes for appropriate screws and anchors to ensure secure mounting to the type
of surface at the selected location.
3. Prevent dust and dirt contamination of the SP40S Multi-Function Facility Communication System
during installation. This contamination can interfere with the operation and reduce the life of the
equipment.
4. Open the door and remove the dead front panel, then mount the SP40S Multi-Function Facility
Communication System at the selected location. Use care to avoid damage to the module during
installation. Do not apply excessive pressure to the PC board or its components, including field wiring
terminals and connectors.
SP40S Multi-Function Facility Communication System Manual, Revision D
6