Instruction Manual

WHEATHEART - GRAIN AUGERS 3. ASSEMBLY
X160-85, X160-105, X160-125
30875 R0 89
3.13. INSTALL THE HOPPER LIFT ARM
1. Determine which side of the auger the hopper will be operating on.
Note: Feed side of hopper must face the main auger when in transport.
2. Position the hopper lift arm assembly on the mount bracket on top of the
lower auger tube with the arm overhanging the side of the auger that the
hopper will be operating on.
3. Fasten hopper lift arm assembly to the mount bracket with four 1/2” x 1-1/2”
bolts (19589) and 1/2” locknuts (19599), as shown in Figure 3.43.
Figure 3.43 Installing the Lift Arm
7/16 X 1-1/4” BOLTS
7/16” LOCKNUTS
[17593]
[18698]