Instruction Manual
3. ASSEMBLY WHEATHEART - GRAIN AUGERS
X160-85, X160-105, X160-125
36 30875 R0
• 1/2” drive impact wrench (recommended)
• 1/2” extension
• 3/8”, 5/8”, 3/4”, and 15/16” sockets for 1/2” drive
• 3/8”, 5/8”, 3/4” and 15/16” flat wrenches
See Table 3.1. for a list of assembly procedures.
Table 3.1. Assembly Procedures
Procedure Page
Identify and Arrange Auger Tube Sections page 37
Connect Auger Tubes page 40
Install the Hydraulic Lift Cylinders page 42
Install the Track Shoe and Track Stop page 46
Install the Boot on the Auger Tube page 47
Assemble the PTO Shield Assembly page 49
Install the Speed Reducer on the Boot page 50
Install the Boot Tow Bar page 53
Install the Discharge Spout page 54
Set the Thrust Adjuster page 55
Apply Logo and Model Decals on the Auger Tubes page 56
Install Truss Support Towers and Truss Tubes page 58
Install Truss Cables page 66
Assemble the Lower Frame page 68
Assemble the Wheel Hub and Install Tires page 70
Connect the Auger Tube to the Frame page 71
Install Lift Cylinder Cables to the Track shoe page 74
Connect Hydraulic Hoses and Ball Valve page 76
Connect the PTO Driveline page 82
Connect the Intake Hopper to the Swing Tube page 83
Connect the Spout Head to the Grain Transfer Boot page 87
Install the Hopper Lift Arm page 89
Install the Hydraulic Winch page 90
Power Swing Assembly page 93
Install the Hitch Jack page 99
Install the Manual Container page 100
Auger-to-Tractor Hookup page 101