Instruction Manual

WHEATHEART - GRAIN AUGERS 6. OPERATION
X160-85, X160-105, X160-125
30875 R0 115
6.2. PRE-OPERATION
6.2.1. CHECKLIST
Tighten all fasteners.
Adjust and/or lubricate boot chain and hopper chain.
Ensure auger rotates freely.
Check that tire pressure is within the manufacturer’s specification.
Ensure wheel bolt torque is within specification.
Check hopper winch and lift cables for damage (fraying, kinking, unraveling).
Replace as required.
Ensure that the cable anchor on the winch drum is secure.
Check gearbox oil levels.
Grease and clean machine if needed.
Ensure hydraulic system is functioning, is free of leaks, and the hoses are not
pinched or kinked.
Ensure that electrical hoses are in good condition.
Ensure that electrical connections are in place and secure.
Ensure that equipment guards are in place and secure.
Check that truss cables are free from damage (fraying, kinking, unraveling).
Cables must be tight and properly adjusted for proper auger tube alignment.
Ensure that the PTO shaft is properly installed.
Ensure that the intake area and discharge spout are free of obstructions.
Ensure that the tractor and auger are in line or as close to being in line as
possible.
Ensure that the tractor park brake is engaged and/or wheels are chocked.
Ensure that the axles are extended.