User Manual
3. ASSEMBLY WHEATHEART - X13 SERIES AUGERS
3.6. INSTALL THE BOOT TOW BAR X1374, X1384, X1394
32 30787 R1
Note: It is recommended you use a thread locking compound that meets or exceeds
Loctite Blue© on all set screws.
Important: To prevent premature failure of the lower bearing, ensure it has been assembled
in the correct sequence.
2. Loop the drive chain around upper and lower sprockets. Push the flighting
shaft down until the chain is tensioned to within about 1/4” deflection, then
tighten the 4 bolts on the bottom bearing. Oil the chain lightly.
Note: For ease of PTO installation, sprocket shield should be attached after the instal-
lation of the PTO driveline. See “Connecting the PTO Driveline” on page 72.
3.6. INSTALL THE BOOT TOW BAR
See Table 3.6. for a list of parts required to install the boot tow bar.
1. Insert the tow bar into the boot channel, and secure the back end loosely with
a 3/4” x 5-1/2” bolt and 3/4” locknut through the back hole in the boot channel
(under the boot).
2. Tightly secure the middle of the tow bar in the channel with a
3/4” x 3-1/2” x 5” square U-bolt and two 3/4” locknuts.
3. Fully tighten the 3/4” nut on the 3/4” x 5-1/2” bolt.
Figure 3.8 Installing the Boot Tow Bar
Table 3.6. Parts Required, Installing the Boot Tow Bar
Part Number Description Amount
29983 Tow bar
1
29997 3/4” x 5-1/2” bolt
1
19601 3/4” locknut
3
28487 3/4” x 3-1/2” x 5” square U-bolt
1
3/4” X 5-1/2” BOLT
3/4” X 3-1/2” X 5” SQUARE U-BOLT
3/4” LOCKNUTS
BOOT
T
O
W
B
A
R
AND 3/4” LOCKNUT
CHANNEL