User guide
WHEATHEART - GHR & WHR GRAIN AUGERS 5. OPERATION
PTO-SD DRIVE MODEL 5.1. PRE-OPERATIONAL CHECKLIST
30641 R1 45
5.Operation
5.1. PRE-OPERATIONAL CHECKLIST
Before operating auger each time, the operator must confirm the following:
• All fasteners are secure as per assembly instructions.
• PTO driveline is connected and secure.
• PTO driveline shield rotates freely.
• Lift cable is not frayed or damaged.
• Lift cable is properly seated in cable sheaves.
• Cable clamps are secure.
• Tube alignment is reasonably straight.
• Auger wheels are chocked, and if necessary, tractor wheels are chocked
or the parking brake has been engaged.
• Intake area and discharge spout are free of obstructions.
• Proper maintenance has been performed.
5.2. AUGER DRIVE & LOCKOUT PROCEDURE
WARNING Before continuing, ensure you have read and understand the relevant information
in the safety section. Safety information is provided to help prevent serious injury, death, or
property damage.
Drive Type Before Operation Lockout
PTO Driveline Before starting, ensure:
• PTO driveline is securely attached to the
tractor and jackshaft
• tractor park brake is engaged and/or wheels
are chocked
• you are not exceeding the maximum operat-
ing length of 80” (2032 mm) of the PTO
driveline or maximum angle of 15°
• PTO drive on the tractor is in the off position
Shut off tractor’s engine
and remove key from
tractor.
• If removing key is
impossible, remove
PTO driveline from
tractor.