Manual

3. ASSEMBLY WHEATHEART - GHR & WHR GRAIN AUGERS
3.12. PTO DRIVELINE GRAIN AUGERS SD
32 30662 R1
3.12. PTO DRIVELINE
1. Clean PTO driveline and flighting shaft ends of any paint or dirt.
2. Slide plain end of PTO driveline onto shaft. Make sure the holes for the roll
pin are lined up and square key is in place (where necessary).
use a 3/8” x 2" long square key; tighten set screws securely (Figure 3.7).
Important: Do not extend PTO driveline beyond 92” when in use.
3. Install transport saddle for the PTO driveline to auger tube about 3’ above the
gearbox assembly. Secure with two 7/16” x 1-1/4” bolts and locknuts.
3.13. UPPER HOUSING LUBRICATION
Fill enclosed upper drive housing with grease.
For continuous use in extreme cold conditions, semi-fluid arctic grease or heavy
oil may be used.
3.14. PLASTIC MANUAL HOLDER
Before beginning installation, ensure that all
winch / auger lift controls are locked in place
and shut down and/or lock out auger.
1. Attach holder to the lower frame arms.
Manual holder must be accessible at all
times, whether frame is up or down.
2. The manual holder cap must face up
(towards the intake end). Attach manual
holder with supplied zip ties. Tighten the zip
ties, securing the holder in place.
Where possible, attach the zip ties above a
frame brace tab to prevent the manual holder
from slipping down the lower frame arms.
2200g 78oz
LOWER
REACH
ARMS
PLASTIC
ZIP TIES
C
A
P
F
A
C
I
N
G
I
N
T
A
K
E
Figure 3.22
Note: