User Manual
WHEATHEART - WHEEL KIT 3. OPERATION AND TRANSPORT
BH/GHR AUGERS 3.1. OPERATION
30736 R1 11
3. Operation and Transport
3.1. OPERATION
1. Place wheel kit in operation position by disengaging spring-loaded lock pin
and turn wheel kit counterclockwise.
2. Secure wheel kit in hole in mounting bracket so that it is roughly perpen-
dicular to the ground.
3. Disengage transport handle by removing snap pin and lock plate and
reinserting snap pin, see Figure 3.1.
4. Lower wheel to ground by turning jack handle and lift auger hopper to desired
height.
Figure 3.1
5. Move auger to desired position using transport handle.