User Manual
Premier Guard Installation Manual
8
INSTALLATION
Installation Site Power Supply Verification
It is STRONGLY RECOMMENDED THAT SOLID GROUNDING BE MAINTAINED FOR THE
POWER TRANSFORMER
. Sometimes poor grounding and high noise from the power source
will adversely affect system sensitivity or detection range.
Parts List –Premier Guard System
Part Name
Order Number
1. Premier Guard Transceiver WGPGTR58
2. Premier Line Control Unit WGPLCU58
3. Control Box Alarm Cover (TBD)
4. Remote Control (TBD)
5. Instruction Manual WG-PGTR58-IM
6. 24vac Transformer WGPS2490-1
Control Box
WGPLCU58
24vac Transformer
WGPS2490-1
Remote Control
WG-(TBD)
Transceiver
WGPGTR58