Use and Care Guide
13
ENGLISH INSTRUCTIONS
HIGH-SPEED STUFFER ASSEMBLY INSTRUCTIONS
NOTE: The High Speed Stufng System
is designed for use with the 10 mm Funnel
ONLY. DO NOT attempt to use the High-
Speed Plastic Auger with any other Funnels.
SERIOUS DAMAGE to the Grinder Head
and other components may occur. Follow
the “Standard Stuffer Assembly Instructions”
located in this manual, when using the 20,
30, or 40 mm Funnels.
1. Insert the Head into the Gear
Housing with the feed chute of the
Head facing straight up. You will need
to line up the slot in the Head with the
Pin inside the Gear Housing. Be sure
the Head is seated fully into the Gear
Housing (FIGURE 8).
2. Tighten the Head Locking Knob to
lock the Head into place.
3. Insert the Auger, with the Auger
Bearing attached, into the Head
(FIGURE 9). Align the Auger Splines
with the Drive Shaft of the Grinder.
NOTE: Periodically inspect
the Auger Bearing for wear.
If the Auger Bearing has
excessive wear, replace it to
prevent head damage.
4. Slide the High Speed Plastic
Auger onto the Auger Pin
making sure the square part of the Plastic
Auger fully seats on to the square portion
of the Auger Pin.
5. Slide the 10 mm Stufng Funnel
through the through the Flange and place
it through the Front Ring Nut.
6. Install the Front Ring Nut, DO NOT
OVERTIGHTEN. Turn the Front Ring
Nut until it makes contact with the
Flange, then make 1/4 turn more to
tighten into place.
7. Insert the neck of the Tray into the
Feed Chute (FIGURE 10).
8. NEVER operate Grinder without the
Tray secured in place (FIGURE 10).
FIGURE 8
FIGURE 9
Head
Auger Bearing
Auger
Auger Splines
Auger Pin
High-Speed
Plastic Auger
Front Ring
Nut
Flange
Gear
Housing
Head
Slot in Head
Head Locking
Knob
Feed
Chute
FIGURE 10
Tray
Head
Feed
Chute
Neck
w WARNING
Cut Hazard. To avoid serious or fatal injury, never reach into
grinder feed chute. Always read instructions.
w WARNING
Electrical Shock Hazard. Disconnect power before
assembling.