Installation
Installation Guide
90cm freestanding cookers
The slot-in type installation uses the appliance as
supplied. The appliance can be mounted on a plinth.
This enables a continuous cupboard kickboard to be
installed, giving a more integrated appearance. There is
no clearance requirement between oven and adjacent
side cabinets.
600mm minimum
vertical clearance
from combustible
surfaces
This surface to be level with
the top edge of the kick board
755mm
900mm
900mm
minimum
600mm
• The anti-tilt brackets are to be secured to the back
wall with appropriate fasteners.
• Two stops are to be screwed to the plinth in locations
as shown (stops provided). The stops locate into
slots in the base of the appliance to prevent the
product from being pulled forward when installed.
• Measurements from the rear wall are to be adjusted if
there are tiles etc. that come between the appliance
and the wall.
• Once services are connected, product can be lifted
onto the plinth and pushed back carefully, ensuring
the appliance engages into both brackets at the rear
and the front stops.
• If the product requires removal for service, it must
be lifted at the front approximately 5mm to clear the
front stops prior to being pulled forward.
+
+
+
+
+
+
C
L
+
+
+
+
104
104
370 370
165
165
344 344
Location of holes for front stops
Measurements are to be adjusted to account for the
thickness of any skirting board or tiles coming between
the back of the appliance and the wall
Front stops
Front stops
Installing the clip-on kick panel
Selected models are supplied with a clip-on kick panel that can
be assembled to clip onto the front feet for a more integrated and
seamless kitchen appearance.
Assemble the clip snap onto the base.
click!
Press in both assembled clip modules into the
kick panel in the orientation as shown below.
click!
Make sure both clip modules are in the same orientation after
installation.
Clip the kick panel onto the front feet of the appliance. Make sure
the kick panel snaps onto the larger section of the front feet.
Installing the trivets
Install the middle trivet first by aligning the trivet with the wok
burner and gently placing the trivet on hob. The middle trivet is
designed to guide the location of the side trivets. Gently place
the side trivets in the orientation shown.
1
2 2
Corner support
Corner support
Self-locating tabs
Self-locating tabs
SLOT-IN INSTALLATION KICKPANEL INSTALLATION TRIVET INSTALLATION
54