Specifications
41
1. Install the Rear Firebox Liner. This panel rests on the Rear
Brick Panel Support.
2. Install the Left Firebox Liner Panel; it sits on the bottom front
edge of the rebox (see Figure 82), a support bracket at the
lower rear of the rebox, and is held in by a retainer at the
top of the rebox. Adjust the panel retainers as required.
5. Install the Top Panel by placing it on top of the Rear Panel and
behind the Left Panel (see Figure 83). Hold it with one hand
or have someone else hold it for you while you place the last
panel. WARNING: If this panel falls from this location it will
possibly break or the paint work will become chipped.
6. Place the Right Firebox Liner Panel in the same manner used
for the Left Panel. The vertical edges of the left and right
panels should line up with the front edges of the rebox sides.
The side panels rest up against the back panel and hold the
top panel in position.
7. Installation of Porcelain Kit for Glass Burner continue on with
next step. Installation of Porcelain Kit for Log Burner go to
step 14.
8. Install the Burner Assembly; refer to Step 1 & 2 of glass Burner
insTallaTion.
9. Attach the Glass Burner Skirt to the Right Burner Cover
Support using two (2) T-20 Torx screws supplied (see Figure
84) and do the same to the Left Burner Cover Support as
you’ve done on the right side.
Figure 84: Porcelain Light Covers Close-up.
inStallation Set-uP
poRceLain kit instaLLation:
Figure 82: Rear & Left Porcelain
Panels in Place.
Figure 83: Top Porcelain Panel in Place.










