Specifications
29
inStallation Set-uP
4) Lift the Door Frame away, being
careful that the glass panel is secure
within the Door Frame.
Figure 44: Door Latch Locations.
gas hook-up:
The DV62 is equipped from factory
with a ½” SAE 45° male gas tting.
This tting will t commonly used
exible gas supply lines.
If the local code requires to use
rigid pipe for gas supply, nish the
gas line inside the control box,
(through the access hole illustrated)
fasten the pipe to the control box
and complete the connection using
a short length ex line.
NOTES:
This appliance and its main gas
valve must be disconnected from
the gas supply piping system during
any pressure testing of that system
at test pressures in excess of ½ psi
(35 kPa).
Isolate this appliance from the gas
supply piping system by closing its
equipment shutoff valve during any
pressure testing of the gas supply
piping system at test pressures equal
to or less than ½ psi (3.5 kPa).
Figure 45: Location of Gas Hook-Up.










