User guide

17
6651-2221
Using the factory DIP-switch settings:
Set DIP-switch S2:1 as desired.
Connect The fibre link between the ODW-720-F1.
Connect the power supply to both ODW-720-F1.
After a few seconds the fibre link should be in operation, indicated by an active CH1
LED.
Connect the serial cables from PLC master and slave to respective ODW-720-F1.
Frames from PLC master that are correctly received the ODW-720-F1 should be
indicated by flashing TD LED.
Frames that are received via the fibre link will be transmitted to the PLC slave
and indicated by flashing RD LED.
Replies from slave to master will be transferred and indicated in the opposite way.
The point-to-point application is up and running.
POWER CH 1
COM +VA +VB COM
POWER CH 1
COM +VA +VB COMTX RX TX RX
Start up guide, point-to-point application
Follow the steps below to get the unit up and running in a simple application.
Master Slave