Operator`s manual
NOTE:
We
recommend that the installer provide
AC
ampmeters (optional)
so
that the
operator can observe the load being taken off each leg
of
the generator.
A circuit breaker should be installed between the generator and the AC load. This circuit breaker should
be rated for the generator's
AC
output and be able
to
react quickly to overloads, subject to motor starting
considerations.
120V 60Hz
1201240V
60Hz
50}+-
2 5
Os
Os
7lUl-i-...,
03
H
110V
50Hz
110/22BV 50Hz
22BV
50Hz
02
sO
50
sO
'1
r
OS
7P
Os
¥3
80
Q3
8 Q
I
I
I
H
l 1
l 2
AC
Voltage Connections
(6
Stud Terminal Block)
(Used with the BTD 100KW, 11.0KW, and the 12.5KW(A) (Generator Sets.)
NOTE: The frame ground wire must be moved when changing from
110
Volts,
50
Hertz
to
220 Volts,
50
Hertz.
For making connections to the
AC
terminal block,
use
1/4
inch terminal ends that will accept multi-strand
wire sized for the number
of
conductors in the bundle, the rating
of
the conductor's insulation, and
amperage that will be drawn through the conductor(s). (Refer
to
the generator's scarlet and gold data
plate for generator amperage ratings.
65
WESTERBEKE
GENERATORS










