MAINTENANCE
SCHEDULE
NOTE:
Use
the engine hour meter gauge to log your engine hours
or
record your
engine hours
by
running time.
CHECK
HOURS
OF
OPERATION
SCHEOULED
EACH
EXPLANATION
OF
SCHEDULED
MAINTENANCE
DAY
50
100
250
500
750
1000
1250
MAINTENANCE
Raw
Water
Pump
0 0 0
Remove
the
pump
cover
and
inspect
impeller,
At
800 operating lwurs,
gasket,
cam
and
cover
for
wear.
Check
the
bearings
disassemble and inspect
and
seals
(the
shaft
should
not
wobble).
Lubricate
for
overhaul.
when
reassembling.
Coolant
System
0 0
Drain,
flush,
and
refill
cooling
system
with
the
appropriate
antifreeze
mix.
Electric
Fuel
Lift
Pump
0
0 0 0 0 0
Periodically
check
the
wiring
connections
and
inspect
the
fuel
line
connections.
*Fuellnjectors
0
Check
and
adjust
injection
opening
pressure
and
spray
condition
(see
ENGINE
ADJUSTMENTS).
*Starter
Motor
0 0
Check
solenoid
and
motor
for
corrosion.
Remove
and
lubricate.
Clean
and
lubricate
the
starter
motor
pinion
drive.
*Preheat
Circuit
0 0
Check
operation
of
preheat
solenoid.
Remove
and
clean
glow
plugs;
check
resistance
(4-6
ohms).
Reinstall
with
anti
seize
compound
on
ttl
reads.
*Engine
Cylinder
0 0
Check
compression
pressure
and
timing
Compression
(see
Engine
Adjustments).
*Torque
Cylinder
Head
0
0
0
At
first
50
hours,
then
every
500
hours
Hold-down
bolts
(see
ENGINE
ADJUSTMENTS).
*
Adjust
the
Valve
Clearances
0 0 0
Adjust
Valve
Clearances
(see
ENGINE
ADJUSTMENTS).
*Heat
Exchanger
0
Remove,
have
professionally
cleaned
and
pressure
tested.
·Water
Injected
Exhaust
0
0
Check
casting
integrity
every
500
hours
of
Elbow
operation.
Replace
as
needed.
*WESTERBEKE
recommends
this
service
be
performed
by
an
authorized
mechanic.