Operator`s manual
2. 
Check 
shift 
linkage 
adjustment 
to 
ensure 
that 
the 
transmission 
shift 
lever 
is 
positioned 
so 
that 
the 
spring 
loaded 
ball 
enters 
the 
chamfered 
hole 
in 
the 
side 
of 
the 
shift 
lever. 
3. 
Connect 
an 
oil 
cooler 
into 
the 
cooler 
circuit 
before 
cranking 
or 
starting 
the 
engine. 
various 
cooler 
circuits 
have 
been 
used 
and 
the 
correct 
cooler 
connections 
should 
be 
found 
from 
service 
literature 
prior 
to 
makeing 
the 
cooler 
installation. 
4. 
Use 
a 
cooler 
or 
sufficient 
size 
to 
ensure 
proper 
cooling. 
5. 
Check 
engine 
rotation 
and 
transmission 
pump 
setting 
and 
the 
pro-
peller 
rotation 
prior 
to 
assembling 
the 
transmission 
to 
engine. 
6. 
Check 
oil 
pressue 
and 
temperature 
when 
transmission 
function 
indicates 
that 
a 
problem 
exist. 
7. 
Use 
the 
recommended 
fluid 
for 
filling 
the 
transmission. 
8. 
Fill 
the 
transmission 
prior 
to 
starting 
the 
engine. 
9. 
Check 
oil 
level 
immediately 
after 
the 
engine 
has 
been 
shut 
off. 
10. 
Use 
a 
clean 
container 
for 
handling 
transmission 
fluid. 
11. 
Replace 
cooler 
and 
lines 
after 
a 
transmission 
failure, 
prior 
to 
installing 
a  new 
or 
rebuilt 
transmission. 
12. 
Check 
fluid 
level 
at 
operating 
temperature. 
Westerbeke Diesel Engines 
72 










