Installation manual

INSTALLATION
RIGGING
AND
LIFTING
The engine/generator
is
fitted with lifting
eyes.
Attach
wire rope or chain slings capable of supporting the
engine/generators weight
to
the
eyes
and
lift the engine/gen-
erator
by
means
of
tackle attached
to
these slings.
The
lifting
eyes have been designed
to
carry
the
full
weight:
auxiliary
slings
are
not necessary.
NOTE:
Rigging work
is
best done by someone experienced
and competent
in
handling
machinery.
LOCATION
AND
MOUNTING
A solid, level mounting platform
is
very important
for
the
proper operation
of
your generator. Select a location that will
allow adequate space
on
all sides
for
ventilation and servic-
ing. Locate the generator away from living quarters, and
away from bilge splash and vapors.
Refer
to
WESTERBEKE'S
installation
manual
for
detailed
information
on
installing
a
Marine
Generator
in
a
boat.
3/4"
PLYWOOD-BOLTED/FIBERGLASSED
IN
PLACE
BATTERY
ATTACHMENTS,
TO
STARTER
MOTOR
REFER
TO
THE
WIRING
DIAGRAM
IN
THIS
MANUAL
(-)
NEGATIVE
LEAD
USE
THE
PAN
AS
A
TEMPLATEFOR
LOCATING
THE
PROPER
MOUNTING
HOLES
TO
THE
PLYWOOD
BASE
(+)
POSITIVE
LEAD
SIDE
VIEW
RAW
WATER
INLET
O.Sin
(2.7mm)
1.0.
HOSE
BOTTOM
VIEW
TOP
VIEW
'
WATER
OUTLET
AND
DlSCHr.RGE.
HOSES
O.Sln
(2.7mm)
1.0.
·FDUR
1/2"
BOLTS
DIMENSION
(INCHES
AND
MM)
DIMENSIONAL
DRAWINGS
For dimensional drawings.
View
the
drawings
on
the
Westerbeke
website www.westerbeke.com
for
the most
current drawings with
dimensions.
Engines & Generators
5