Product Manual
Hardware Pack
Cut Deck to Required Size:
Utility Loading Ramp
1 Pc
Assemble Main Beams:
Main Beam - 4 Pcs
2 Left, 2 Right
Joint Plates
(4 Right, 4 Left)
If Any Parts Are Missing Please Call Customer
Service Toll Free 1-888-335-4507.
Required Tools: Electric Drill with 1/4” bit, 7/16” and 9/16” socket with extension,
two 9/16” wrenches, 7/16” wrench.
Cut two pieces of decking material to a length of 60” (10 ft ramp) or 72” (12 ft ramp). The width of the
deck may be any dimension up to 48”. We recommend using 3/4” plywood as your decking material.
Thin, or poor quality decking will reduce capacity.
Assembly And Use Instructions
10 and 12 ft.
Use 3/8” bolts to assemble 4 main beams as shown below. Use washers on both sides. DO NOT
TIGHTEN ANY BOLTS AT THIS TIME. HAND TIGHTEN ONLY.
One RHS and one LHS joint plate for
each beam end.
Beam brace bolts to the
side of the main beam
Step 1
Verify all parts are present:
Beam Brace - 4 Pcs
2 Left, 2 Right
Step 2
Step 3
Steel & Tube
Western



