Assembly Instruction
apex tower
assembly instructions
Page 3 of 69756131/9756149- 01/13/09
1. Lay both side rails (A) & (I) on a clean smooth surface such a carpet or cardboard. Insert can bolts (1) 
 into the holes shown in the drawing.
2. Layout shelves in the order that the drawing shows. Insert cam lock (2) into bottom of shelves as the 
 drawing shows. Align holes in side of shelves with the cam bolts (1). Align top and bottom rails with the 
 holes in the side rails. Press together  rmly. Once installed you must turn the cam lock clockwise with a
 phillips head screwdriver to tighten.
1
2
1
Notice the location of the 
holes in the bottom of the 
shelves.
2
A
I
B
H
C
D
E
F
G
A






