Manual

3.2 Behaviour after power-on
After supply voltage switch-on, the unit starts with the operating level.
The unit is in the condition which was active before power-off.
If the controller was in manual mode at supply voltage switch-off, the controller
will re-start with the last output value in manual mode at power-on.
3.3 Operating level
The content of the extended operating level is determined by means of BlueCon
-
trol (engineering tool). Parameters which are used frequently or the display of
which is important can be copied to the extended operating level.
Operation
Behaviour after power-on 12 KS 90-1 / KS 92-1
Ò
Ò
Ù
Ù
Ù
Ù
A
utomat
i
c
Extended operating level
M
anua
l
i
i
only
display
switching
Display
Error list (if error exists)
Y21
1199
1200
1199
È
Ì
È
Ì
Y21
1199
1200
1199
È
Ì
FbF.1
126
Err
2
126
Err
time
out
time
out
time
out