Specifications
This Report Contains 2 Volumes
You Are Here
Volume 1 – Main Report
• Abstract
• Foreword
• Executive Summary
• Table of Contents
• Section 1 – Introduction
• Section 2 – Existing Conditions / Affected Environment
• Section 3 – Future Without Project Conditions
• Section 4 – Identification of Problems and Opportunities
• Section 5 – Formulation of Alternative Plans
• Section 6 – The Selected Alternative Plan
• Section 7 – Environmental Effects of the Selected Plan
• Section 8 – Plan Implementation
• Section 9 – Summary of Coordination and Environmental Compliance
• Section 10 – Recommendations
• Section 11 – Glossary of Terms and Acronyms
• Section 12 – Preparers of the PIR
• Section 13 – References
• Section 14 – Index
Volume 2 – Annexes and Appendices
• Annex A – U.S. Fish and Wildlife Service Draft Fish and Wildlife
Coordination Act Report and U.S. Army Corps of Engineers
Responses
• Annex B – Section 404(b)(1) Evaluation
• Annex C – CZMA Consistency Evaluation
• Annex D – Revised Draft Project Operating Manual
• Annex E – RECOVER Reports
• Annex F – Water Quality Monitoring Plan
• Annex G – Legislative and Statutory Requirements
• Annex H – Pertinent Correspondence
• Appendix A – Engineering
• Appendix B – Economic and Social Considerations
• Appendix C – Environmental
• Appendix D – Recreation
• Appendix E – Real Estate
• Appendix F – Draft Water Quality Assessment Report










