Specifications

This Report Contains 2 Volumes
You Are Here
Volume 1 – Main Report
Abstract
Foreword
Executive Summary
Table of Contents
Section 1 – Introduction
Section 2 – Existing Conditions / Affected Environment
Section 3 – Future Without Project Conditions
Section 4 – Identification of Problems and Opportunities
Section 5 – Formulation of Alternative Plans
Section 6 – The Selected Alternative Plan
Section 7 – Environmental Effects of the Selected Plan
Section 8 – Plan Implementation
Section 9 – Summary of Coordination and Environmental Compliance
Section 10 – Recommendations
Section 11 – Glossary of Terms and Acronyms
Section 12 – Preparers of the PIR
Section 13 – References
Section 14 – Index
Volume 2 – Annexes and Appendices
Annex A – U.S. Fish and Wildlife Service Draft Fish and Wildlife
Coordination Act Report and U.S. Army Corps of Engineers
Responses
Annex B – Section 404(b)(1) Evaluation
Annex C – CZMA Consistency Evaluation
Annex D – Revised Draft Project Operating Manual
Annex E – RECOVER Reports
Annex F – Water Quality Monitoring Plan
Annex G – Legislative and Statutory Requirements
Annex H – Pertinent Correspondence
Appendix A – Engineering
Appendix B – Economic and Social Considerations
Appendix C – Environmental
Appendix D – Recreation
Appendix E – Real Estate
Appendix F – Draft Water Quality Assessment Report