Instruction Manual

Upper
F
F
rame Asse
m
m
bl
y
For easi
e
tape fro
m
each han
Snow T
h
e
r assembly,
m
the factor
y
dles part, as
h
rower.
the handle
f
y
. This tape
viewed fro
m
f
rames are
m
indicates th
e
m
the opera
t
m
arked with
y
e
LEFT sid
e
t
or’s positio
n
y
ellow
e
of
n
of the
Hold the
that the
s
(Fig. 3)
upper fram
e
s
crew holes
a
e
with the y
e
a
lign with t
h
e
llow tape o
n
h
e holes on t
h
n
the LEFT
h
e middle f
r
side so
r
ame.
Insert a
T
handle.
T
and tigh
t
T
-
b
olt into e
a
T
hen attach
t
en. (Fig. 4)
a
ch hole wi
t
a saddle wa
t
h the head
o
sher and kn
o
o
n the inside
o
b on the o
u
of the
u
tside
Repeat t
h
h
is step on t
h
h
e other sid
e
e
of the han
d
d
le.
Locate t
h
cord to t
h
evenly s
p
h
e three Cab
h
e frame of
t
p
aced interv
a
le Clips in t
h
t
he unit by
c
a
ls. (Fig. 5)
h
e parts bag
c
lipping the
m
. Secure the
m
onto the f
r
power
r
ame at
#5662SNOWTHROW
E
E
ROPERATO
R
R
’SMANUAL 9