Product Manual
Connect AC power to MS3 Classic stand and monitor
This section applies only to devices with Classic (MS3) stands.
1. Thread the power cable from the power supply through one of the spaces next to
the pole to reach the monitor.
2. Attach the power supply to the underside of the basket using the 2 Phillips screws
provided.
3. Connect the power cable to the monitor.
4. Connect the power cord to the mains outlet.
5. Power up the monitor.
Attach the probe well and temperature probe
1. Align the slots on the monitor and probe well, and slide the probe well onto the
monitor.
The probe well snaps into place when it is fully seated.
2. On the underside of the probe well, attach the SureTemp probe connector.
3. Insert the SureTemp probe into the probe well.
4. In the compartment to the left of the probe well, insert a Welch Allyn probe cover
carton.
Additional cartons of probe covers can be stored in the lower compartments of the
cart if a cart is used.
Directions for use Setup 21










