User Guide

Part number 550-100-325/0718
10
AquaBalance
®
SERIES 2 WALL MOUNT GAS-FIRED WATER BOILERBoiler Manual
4 Converting boiler to propane
Prepare boiler for propane (if required)
AquaBalance®
80/120/155
Propane operation
ALL boilers must be converted for pro-
pane operation.
Converting an existing natural gas-fired
boiler for propane
For a boiler already
installed, you must turn off gas supply, turn off
power and allow boiler to cool before proceed-
ing. You must also completely test the boiler after
conversion to verify performance and start up the
boiler following instructions beginning on page 75
of this manual.
Verify Conversion kit—See Figure 7.
LP gas venturi will have a black label and will be
clearly labeled LPG”.
Natural gas venturi will have a white label and
will be clearly labeled NAT GAS”.
Failure to comply could result in severe personal
injury, death or substantial property damage.
Figure 7 Natural and Liquefied Petroleum (Propane) gas
conversion kits
Boiler Model Kit Part Number
AB-80 NG
640-000-022
AB-80 LP
640-000-024
AB-120 NG
640-000-023
AB-120 LP
640-000-025
AB-155 NG
640-000-082
AB-155 LP
640-000-133
This conversion kit shall be installed by a qualified
service agency in accordance with the
manufacturer’s instructions and all applicable codes
and requirements of the authority having jurisdiction.
If the information in these instructions is not followed
exactly, a fire, an explosion or production of carbon
monoxide may result causing property damage,
personal injury or loss of life. The qualified service
agency is responsible for the proper installation of this
kit. The installation is not proper and complete until
the operation of the converted appliance is checked as
specified in the manufacturer’s instructions supplied
with the kit.
Follow all instructions in proper order.
Do not tamper with venturi. DO NOT change or modify
venturi in any way.
Do not leave an uninstalled venturi in the building.
Caution the gas supply shall be shut off prior to discon-
necting the electrical power, before proceeding with the
conversion.
Label all wires prior to disconnection when
servicing controls. Wiring errors can cause
improper and dangerous operation.
Natural to LP Conversion Kit Part Numbers
LP to Natural Conversion Kit Part Numbers
AB-80 NG P/N 640-000-022 LP to Natural Gas Conv. Kit contents:
Venturi - Natural Gas 10.6m
1
Gasket Nitrile Rubber 167 x 63.5X3.53 NBR
1
Label Gas Conversion
1
Label AB-80 Rating Plate Conversion NG
1
Instructions Conversion LP to Natural Gas
1
AB-120 NG P/N 640-000-023 LP to Natural Gas Conv. Kit contents:
Venturi - Natural Gas 12.6m
1
Gasket Nitrile Rubber 167 x 63.5X3.53 NBR
1
Label Gas Conversion
1
Label AB-120 Rating Plate Conversion NG 1
Instructions Conversion LP to Natural Gas 1
AB-80 LP P/N 640-000-024 NG to Propane Gas Conv. Kit contents:
Venturi - 10.6 GPL
1
Gasket Nitrile Rubber 167 x 63.5X3.53 NBR
1
Label Gas Conversion
1
Label AB-80 Rating Plate Conversion LP
1
Instructions Conversion Nat to LP Gas
1
AB-120 LP P/N 640-000-025 NG to Propane Gas Conv. Kit contents:
Venturi - 12.6 GPL
1
Gasket Nitrile Rubber 167 x 63.5X3.53 NBR
1
Label Gas Conversion
1
Label AB-120 Rating Plate Conversion LP
1
Instructions Conversion Nat to LP Gas
1
AB-155 LP P/N 640-000-133 NG to Propane Gas Conv. Kit contents:
Venturi -
1
Gasket Nitrile Rubber 167 x 63.5X3.53 NBR
1
Label Gas Conversion
1
Label AB-155 Rating Plate Conversion LP
1
Instructions Conversion Nat to LP Gas
1
AB-155 NG P/N 640-000-082 LP to Natural Gas Conv. Kit contents:
Venturi - Natural Gas 16.6m
1
Gasket Nitrile Rubber 167 x 63.5X3.53 NBR
1
Label Gas Conversion
1
Label AB-155 Rating Plate Conversion NG 1
Instructions Conversion LP to Natural Gas 1