Install Instructions

®
Series 3 WATER BOILER — Boiler Manual
Prepare boiler location
Figure 1 Minimum clearances to combustible surfaces and
recommended minimum service clearances
Provide minimum clearances
From combustible materials (see Figure 1)
1. Hot water pipes
All directions — ½ inch.
(not shown in Figure 1)
2. Double-wall vent pipe
All directions — 6 inches.
3. Single-wall vent pipe.
All directions — 18 inches.
4. Boiler jacket surfaces
Top of Control Pod cover — 12 inches.
Sides and back — 2 inches.
5. Burner cover
All directions — 2 inches.
Combustible clearances always take pre-
cedence over service clearances.
For service access (see Figure 1)
If you do not provide the minimum
service clearances shown, it might not
be possible to service the boiler without
removing it from the space.
1. Recommended service clearances:
Front of burner cover — 20 inches
Jacket top — 24 inches
Jacket sides and back — 6 inches
Burner door swing clearance — 12 inches minimum
(door must swing fully open)
Part number 550-142-182/1014
8