User Guide
Fast-Track Setup — The WIZARD (continued)
EVERGREEN WIZARD
## OF ##
LOCAL
▼
-
▼
NETWORK
SWI TCHING T IMES
LP1 MAX ON T IME : ###M
|
▼
▼
|
NET MIN ON TIME : ###M
NET MAX ON T IME : ###M
|
▼
▼
|
LP2 MIN ON TIME : ###M
NEXT STEP HELP
BACK SELECT EDI T
s The timings set on this screen prevent the boiler
from operating too long on one demand if
another demand is present. They also prevent
short cycling on a demand.
s LP1 and LP2 are times for local priorities.
s MIN NET ON TIME and MAX NET ON TIME
are the maximum and minimum times this
boiler will dedicate to a call from a network
demand.
EVERGREEN WIZARD
## OF ##
BO I L ER SEQUENC I NG
SEQUENCE TYPE :
SMART
BASERATE HIGH: ###%
BASERATE LOW: ###%
LEAD BO I LER ROTATE :
I NCREMENTAL HOURS
ROTATE FREQ: ##DAYS
FORCE LEAD ROTATE : YES
NEXT STEP
HELP
BACK SELECT NEXT
s Use this screen to set how boilers are sequenced
and how usage is rotated between boilers on
the network.
s For a complete explanation of sequencing and
rotation, see page 49 and page 50.
s Sequencing means the way in which boiler
firing rate is controlled as boilers are turned on
and off by the master boiler.
– Three SEQUENCE TYPES are available:
SERIES sequencing allows each boiler to
reach full input before bringing on the next
boiler in sequence. PARALLEL sequencing
uses a limiter, called BASERATE HIGH, to
limit the firing rate before adding additional
boilers. SMART sequencing (factory default
setting) uses a low firing rate setting, called
BASERATE LOW, to keep boilers at a low
firing rate, bringing on additional boilers at
reduced rate until all boilers are on if neces-
sary. Boilers are then allowed to modulate to-
gether as high as necessary to meet demand.
s Rotation means how and how often the boiler
firing order is changed.
– LEAD BOILER ROTATE options are
based on how long a boiler has operated. Se-
lect either OFF, BY BOILER ID, TOTAL
HOURS or INCREMENTAL HOURS.
See detailed explanation of options on
page 49.
– Use the ROTATE FREQ setting to control
how often the rotation sequence is changed.
– FORCE LEAD ROTATE – If set to YES,
then when the frequency timer expires and
the new order is calculated, this forces the
new boiler order to take effect while a heat
demand is currently active.
EVERGREEN WIZARD
## OF ##
SET DATE & T IME
TIME: HH:MM AM
DATE : MM/ DD / YY
BACK SELECT NEXT
s This screen appears ONLY on the master boiler,
not on shadow boilers.
s Set the time and date to ensure that control
logs accurately record time/date of occurrences.
s Time and date information is provided to the
shadow boilers by the master boiler.
EVERGREEN WI ZARD
## OF ##
MA INT E NANCE I NFO
NAME: ################
PHONE : ###-###-####
MODEL :####### ###-##
CP#: ##########
INSTALLED : DD/MM/YY
LAST DAT E : DD/MM/ YY
NEXT DATE : DD/MM/ YY
INTERVAL SET :12MONTHS
WIZARD COMPLETE
HELP
BACK SE LECT NEXT
s Use this screen to enter relevant data about the
installer and boiler.
s See Figure 33, page 58 for full explanation of
the inputs on this menu.
Part number 550-100-193/0817
– 13 –
®
CONDENSING GAS BOILER — 70/110/155 Advanced Manual