Advanced User Guide
Part number 550-100-160/0715
– 10 –
Fast-Track Setup — Steps
The WIZARD must be used when using the Fast-Track Setup procedure. This is necessary to ensure that all required settings
are made. In addition, all instructions in the Evergreen boiler manual must be followed completely. Failure to comply could
result in severe personal injury, death or substantial property damage.
Step 1
Mechanical
s )NSTALLBOILERSPEREvergreenBOILERMANUALANDALL
APPLICABLECODESINCLUDINGVENTAIRPIPINGANDWATER
PIPING
s 3EESUGGESTEDPIPINGINTHISMANUALANDBOILERMANUAL
%ACHBOILERmustBECONNECTEDWITHPRIMARYSECONDARY
PIPINGANDSUPPLIEDWITHABOILERCIRCULATOR
s !SSHOWNINTHESUGGESTEDPIPINGEXAMPLES$(7TANKS
CANBEEITHERPIPEDDIRECTLYOFFOFINDIVIDUALBOILERSORASA
SEPARATEZONEINTHEHEATINGSYSTEM
s 3EEPAGEFORADDITIONALINFORMATIONONMULTIPLEBOILER
INSTALLATIONOPTIONS
Step 2
Electrical
&ORDETAILSSEEFIELD WIRINGINFORMATIONBEGINNINGON
PAGE
BOILER POWER SUPPLY
s #ONNECTMINIMUM6!#POWERTOBOILERASDIRECTEDON
THEBOILERWIRINGDIAGRAMONBOILERANDONPAGE
INPUTS & OUTPUTS
s %ACHBOILERPROVIDESTHREEINPUTOUTPUTPAIRS)NPUTCIRCUITS
ARE6!#$/./4APPLYVOLTAGE5SEDRYCONTACTSONLY
/UTPUTSARE6!#AMPSMAXUSERELAYSIFLOADS
EXCEEDAMPSORIFOUTPUTSMUSTBE6!#ORMUSTBE
ISOLATEDCONTACTS
s 4HEINPUTOUTPUTSCANBEUSEDWITHZONETHERMOSTATSAND
ZONECIRCULATORSORZONEVALVESREQUIRESISOLATIONRELAYS
UNLESSVALVESARE6!#PROVIDINGUPTOTHREEZONESPER
BOILERONAMULTIPLESYSTEM
s %ACHBOILERALSOPROVIDESA6!#OUTPUTFORITSBOILER
CIRCULATOR5SEARELAYIFCIRCULATORREQUIRESFORTHAN
AMPS
s )FASYSTEMPUMPISTOBEOPERATEDBYTHEEvergreen
CONTROLSCONNECTTHEPUMPTOANYOFTHEAVAILABLEOUTPUTS
4HESYSTEMPUMPCANBEACTIVATEDBYAREMOTECONTACTOR
CANBEAUTOMATICALLYACTIVATEDONHEATDEMAND3ETUPFOR
PUMPOPERATIONISDONEINTHE!#4)6!4%/54054SCREENOF
THE7):!2$
SENSORS
s #ONNECTANOUTDOORSENSORSYSTEMSUPPLYSENSORAND
SYSTEMRETURNSENSORTOATLEASTONEOFTHEBOILERSINA
MULTIPLEBOILERSYSTEM
s 0REFERABLYCONNECTOUTDOORSYSTEMSUPPLYANDSYSTEM
RETURNSENSORSTOMORETHANONEBOILERTOPROVIDE
REDUNDANCY)FONEOFTHESENSORSFAILSTHEMASTERBOILER
%VERGREENCONTROLAUTOMATICALLYLOOKSFORANAVAILABLE
SENSOR
MULTIPLE BOILER COMM CABLES
s &ORMULTIPLEBOILERSCONNECTBOILERTOBOILER
COMMUNICATIONCABLESASDIRECTEDONPAGE
ADDITIONAL INFORMATION
s &ORmOWSWITCHOR#!$INTERLOCKWIRINGSEEPAGE
s &OREXTERNALLIMITCONNECTIONSSEEPAGE
s &ORLOWWATERCUTOFFCONNECTIONSSEEPAGE
s &ORn6$#INPUTSSEEPAGE
ZONING METHODS
s 3EEWIRINGANDCONTROLSETUPINFORMATIONFORTYPICALZONING
APPLICATIONSBEGINNINGONPAGE
s 3EEEXAMPLESYSTEMSBEGINNINGONPAGE
Step 3
POWER ON
Follow all instructions in the Evergreen
boiler manual, including all pre-start-up
inspections and final checks.
s 4URN/&&THEMANUALGASCOCKATTHEBOILERTOPREVENTGAS
mOWDURINGSETUP
s 4URNTHEBOILER/./&&SWITCHTO/.
s &OLLOWTHEPROMPTSONTHESCREENTOREACHTHE"/),%2
3%44).'3INITIALSTARTUPSCREEN
s 3EE&IGUREPAGEFORNAVIGATIONINFORMATION.OTETHAT
THESCREENSEQUENCECHANGESAFTERINITIALSETUPASSHOWN
Step 4
WIZARD
s 3ELECTTHESTART WIZARDOPTIONFROMTHE
INITIALSCREENBOILER SETTINGSMENUSEE
&IGUREPAGE
s 5SEONSCREENHELPASNEEDED&ORADDITIONALINFORMATION
SEEDETAILSINTHISMANUAL
s DO NOTSELECTSKIP WIZARD UNLESSTHECONTROLIS
TOBECONlGUREDMANUALLY
SINGLE BOILERS — Set up the control
following instructions in the
Evergreen
boiler manual. If ADVANCED settings
are required, change to ADVANCED
mode from the CONTRACTOR menu.
See ADVANCED mode setup information
elsewhere in this manual.
Step 5
Finish setup
s 3OMEADDITIONALCONTROLSETTINGSMAYNEEDTOBECHANGED
DEPENDINGONTHEAPPLICATION
s 3EEEXPLANATIONOFEvergreenCONTROLOPERATIONAND
SETTINGSBEGINNINGONPAGE
s For high-demand loads requiring fast
response, such as network DHWACCESSTHE
.%47/2+02)/2)49SCREENFORTHEASSIGNEDPRIORITYSEE
&IGUREPAGE#HANGETHE-)."/),%23TOTHE
NUMBEROFBOILERSNEEDEDFORPEAKLOAD
Step 6
Start-up
s !PPLYTHEEvergreenBOILERMANUALINSTRUCTIONSTOVERIFY
THEINSTALLATIONANDTOSTARTUPTHEBOILERUSINGCOMBUSTION
TESTINSTRUMENTSASDIRECTED
CONDENSING GAS BOILER — Advanced Manual
™