User Guide

Part number 550-100-400/0717
25
"!3)#).34!,,!4)/.
®
SERIES 4 GAS-FIRED WATER BOILERBoiler Manual
DIRECT VENT
&IGURE DIRECT VENT!00,)#!4)/.36ENTANDAIRTERMINATIONOPTIONS
DIRECT VENT
SIDEWALL termination
DIRECT VENT
VERTICAL termination
DIRECT VENT
VERTICAL vent and
SIDEWALL air
7EIL-C,AIN
SIDEWALL
TERMINATION
PLATE
3EE"OILER
MANUAL
PAGE
vORv
CONCENTRIC
TERMINATION
3EE"OILER
MANUAL
PAGE
6CX
7&/5
"*3
6ERTICAL
VENT
TERMINATION
AND
3IDEWALL
AIR
TERMINATION
3EE"OILER
MANUAL
PAGE
674CX
7&/5
"*3
vORv
CONCENTRIC
TERMINATION
3EE"OILER
MANUAL
PAGE
6ERTICAL
TERMINATIONWITH
SEPARATEVENT
AND
AIRPIPES
3EE"OILER
MANUAL
PAGE
3IDEWALL
TERMINATIONWITH
SEPARATEVENT
AND
AIRPIPES
3EE"OILER
MANUAL
PAGE
$IRECTVENT
INSTALLATION
SEQUENCE
3TEP Install the boiler.
3TEP Determine the termination method — sidewall or vertical, concentric or separate pipes, etc.
3TEP Determine proper location for wall or roof penetration for each termination.
3TEP Install termination assembly as described in this manual.
3TEP Install air and vent piping from boiler to termination.
3TEP Install pipe supports and brackets as required.