Install Instructions
Part number 550-100-090/1113
57
GAS-FIRED WATER BOILER — Boiler Manual
!$6!.#%$).34!,,!4)/.
Multiple boiler water piping (continued)
Legend — Figure 62
1 Flow/check valve (each boiler)
2 Isolation valves (when used)
3 Cap
4 Easy-Fit® Manifold (supply) — layout and size per page 56
5 Easy-Fit® Manifold (return) — layout and size per page 56
6 Primary circulator
7 Expansion tank (diaphragm type)
8 System air eliminator
9 System automatic air vent
10 Pressure reducing valve
11 Check valve or backflow preventer, as required by applicable codes
12 Isolation valve
13 Cold water supply
14 Supply water temperature control (when used)
15 Low water cutoff (when used) (place above primary header)
16 Water flow switch (when used)
17 Boiler circulator (each boiler)
18 System supply
19 System return
20 Boiler relief valve and discharge piping, installed per Ultra Boiler
Manual
24 Strap system supply and return sensors to lines as shown, at least 6
pipe diameters (but no more than 3 feet) from boiler connection
tees.
&IGURE Piping schematic — typical piping for multiple Ultra boilers, using Weil-McLain Easy-Fit manifolds