Installation guide

8 PV Clinics Installation Manual 21/07/11 01.00 01/12
2. Installation
2.1 General
Electrical installation must be carried out by qualified technical personnel in compliance with general electri-
cal engineering regulations and current legislation. Specific regional standards must also be complied with.
Be sure that there is no voltage applied to any part of the housing, and that the PV Array is disconnected be-
fore installing or removing the equipment.
Always use a screwdriver with the correct blade size.
The connecting cables must be routed so that they are firmly positioned and fitted with a strain relief
mechanism.
For protection against electrocution, the equipment must be installed in a suitable housing or electrical panel.
Take the necessary precautions regarding electrostatic discharge while handling and mounting the device.
2.2 Location
The transclinic is designed to mount on TS35 DIN rail (normally in a string combiner box).
The final location of the device must provide sufficient fire protection in compliance with the
UNE-EN 60439-1 standard. It must also provide sufficient mechanical support.
Transclinic modules are designed to work in an operating temperature range of -20 °C to +70 °C.