User Documentation
Planning
2053260000/05/2015
97
2.24  Checklist for planning
Requirements Notes
Cable runs
Have the minimum 
transfer distance 
requirements been met?
Have the maximum permitted 
bending radii been met?
Have the permitted ambient 
conditions been met?
Product selection
Are all measures resulting from 
applicable standards planned?
Have the dened 
specications been met?
Distributor
Has access from the front and 
rear been guaranteed?
Has sufcient space been left 
for later extensions?
Has space been provided so 
that the doors can be 
fully opened?
Function guarantee
Have measurement reports 
and documentation been 
produced for the cabling?










