User Documentation
2053260000/05/201596
Planning
2.22  Important questions to ask when planning the network 
infrastructure
•  What kind of cabling exists in the building / system?
•  What cabling/connection system is used?
•  How is the connection to the building network to be made?
•  Where is the machine connection point?
•  How great a distance is there from the building network?
•  What connection lengths are needed to the network participants?
•  Is redundant cabling needed?
•   Should the machine distributor be placed in the control cabinet or be a 
standalone unit?
•  What kind of earthing concept is used?
•  What connection system should be used?
2.23  Tender specication sheets
Use the service provided by many network component manufacturers and 
download your tender specication sheets – including some in GAEB (Joint 
Committee on Information Technology in the Construction Industry) format.










