User Documentation
2053260000/05/2015144
Installation
3.12  Checklist for installation 
Requirements Notes
Were the dened  
specications observed?
Is the cable type the planned 
type?
Was the cable laid as 
planned?
Were reserves provided 
for commissioning and 
extensions?
Was the minimum cable 
spacing observed?
Were the plug-in connectors 
used as planned?
Are the manufacturer's plug-in 
connector test certicates 
available?
Were all cables and 
connections tested?
Were all test results 
documented?
Do the transmission sections 
have sufcient reserves for the 
electrical parameters?
Are all connections marked?










