User Documentation
Title: topGUARD IO-Link Register Description
2020.02.17, Page 4/21
DocVersion:
1.2
released
2 Addressing the topGUARD station
Before you start the commissioning work, the following requirements must be fulfilled:
• The topGUARD station must be fully assembled and wired.
• The power supply must be connected.
1.) Switch on power supply
The electronic load monitors are switched off exworks. When first commissioned, the load monitors must
therefore be switched on individually after finished the addressing procedure.
2.) Start addressing phase of topGUARD station
a) To start the addressing phase of the installed topGUARD station the push-button (ADD) on the TGD FIM-
C must be pressed.
b) All yellow LED’s (ADD) are starting flashing.
c) Pressing the button on each electronic load monitor TGD ELM-xx will set the address of the device. It is
recommending starting with the addressing procedure of each TGD ELM-xx from the left to the right.
d) After the last TGD ELM-xx inside the topGUARD station is addressed, it is necessary to press the push-
button on the TGD FIM-C again, to exit the addressing mode.
3.) Switching load monitors ON / OFF after addressing phase
Switch on all load monitors individually by pressing the respective reset button “R”.
4.) Installing the PRO COM IO-LINK module