User Documentation
User Manual Managed Switches 
137 
4.2.4 Overview of Operation Procedure 
The following steps show how to integrate the switch into a PROFINET network: 
1. Activate PROFINET protocol on the switch 
   Enable checkbox PROFINET in switch web UI   
2. Create a PROFINET I/O subnet project in STEP 7 
   Create a PROFINET I/O Ethernet project for deploying environment 
3. GSD file installation 
   Import Weidmüller switch GSD into the project 
4. Device configuration 
   Search and discover the switch in STEP 7. Configure PROFINET attributes such as IP   
  address, device name and I/O parameters. 
5. Save and load the project into the PLC 
   Load this project and save into the PLC 
6. Monitoring the Switch 
   Use STEP 7 to monitor switch attributes 
4.2.5 Create a PROFINET I/O Subnet Project 
Start SIMATIC Manager, click file in the menu bar > 
New Project 
Name your project in the Name field then click OK. 










