User Documentation

Weidmüller Interface GmbH & Co. KG
Klingenbergstraße 26
D-32758 Detmold
Germany
Fon: +49 5231 14-0
Fax: +49 5231 14-292083
www.weidmueller.com
Installation
FieldPower
®
Enclosure Size 3
for I/O-System IP20
1. Prepare the lower part of enclosure and snap in the mounting rail
4. Screw down the cover
2. Insert seals
1. Insert split seal
2. Insert pre-
assembled
cables into the
sealing insert
3. Insert the sealing
insert into the
split seal (RKDG
D17 PT6) with
positive locking
and close it
1. Open breakout areas
2. Insert cable gland and
lock with lock nut
3. Equip the mounting rail
1. Snap I/O system and terminal blocks
onto mounting rail
2. Wire electronic components with the
pre-assembled cables
Installationsvideo:
https://youtu.be/dyChOgyaQgQ
Application note
1005-2020
*technical changes under reservation