User's Manual

11
19
20
17
18
89
94
49
49
72
51
88
46
94
94
53
57
54
54
71
71
72
6
87
46
73
71
7
2
4
17. Locate the Short Cable (94). Attach the Cable to
the Front Upright (4) with an M10 x 72mm Bolt
(
89), an M10 Washer (71), and an M10 Nylon
Locknut (72).
18. Wrap the Short Cable (94) under a 90mm Pulley
(46). Attach the Pulley and two Pulley Covers (49)
to the Double ā€œUā€-bracket (51) with an M10 x
53mm Bolt (88) and an M10 Nylon Locknut (72).
Make sure the large tabs on the Pulley Covers
are on the top.
19. Attach the Short Cable (94) to the ā€œUā€-bracket
(53) with an M8 Nylon Locknut (73). Thread the
Locknut onto the end of the Cable so that two
threads show past the Locknut (see the inset
drawing).
20. Locate the High Cable (57). Route the Cable up
through the Top Frame (6) and over a 90mm
Pulley (46). Attach the Pulley inside the Top
Frame with an M10 x 68mm Bolt (87), two M10
W
ashers (71), two 12mm Spacers (54), and an
M10 Nylon Locknut (72).
Large
Tab
53
73
94
21.
Route the High Cable (57) over a 90mm Pulley
(46) and down through the T
op Frame (6).
Attach
the Pulley inside the Top Frame with an M10 x
68mm Bolt (87), two M10 Washers (71), two
12mm Spacers (54), and an M10 Nylon Locknut
(72).
21
87
6
57
71
72
54
71
54
46