Installation guide

103666_EBH_Rev1.0_080215
MPE 750 Turbo Marine
Closed Loop
Installation Guide
Page 24
8 Maintenance
Activity
Procedure
see page
1st
mainte-
nance
h
1)
Maintenance interval
h
1)
At end of season
after 25 every 50 every 100
Motor oil and oil
lter
Change 14
2)
2)
Coolant Change 20 every 4 years
4)
Spark plugs
Check /
clean
23
Change 23
3)
Valve play
Check /
set
26
3)
3)
Fuel lter Change 32
3)
Following table shows the maintenance intervals for the marine engine.
1)
h = hours of operation
2)
or at least once a year if the hours of operation speci ed above are not reached before
that.
3)
or at least every two years if the hours of operation speci ed above are not reached
before that.
4)
Valid for engine manufacturers ll. Please note the instructions provided by coolant
manufacturer, when using other coolants.
For detailed maintenance informations please consult the service handbook.
This handbook can be downloaded in the service section at:
www.weber-motor.com