Instruction manual
BBB Weather Station Manual
Version 1.0, Release 1 January 2005
- 27 -
NOTES:
• WeatherBug recommends that you tape the connector ends together before
running them inside the building (tape them fully to prevent damage or loosening
individual wires). Do not cut connectors off. A single loose cable connection
can cause system errors.
• Route Data Cable through 1¾ inch outside diameter conduit on exterior of
building.
• Seal building hole and both ends of conduit using caulk/putty.
• Because the WeatherBug Weather Station Data Cable is UV-rated, conduit is not
required along the length of the mast, but should be used along the length of the
building.
• Use the shortest route possible when running cables inside the building.
• The Data Cable ends at the BBB. Excess cable should be coiled, tied and stored
near the BBB.
12. Securely attach a grounding cable to a metal part of the mast. The mast MUST be
grounded to protect against lightning and static charge build-up. The ground wire
must be connected to an appropriate location (consult a school or district electrician
to ensure proper grounding).
IMPORTANT: Ground cable and installation must conform to all applicable local
building codes. The mast must be grounded to an "earth" ground.
The buyer/installer is responsible for this procedure and for ensuring that materials and
methods conform to all applicable building codes.
I
n
stalling Outdoor Components (Continued)