Instruction manual
BBB Weather Station Manual
Version 1.0, Release 1 January 2005
- 26 -
7. Secure the three cables below the Sensor Shelter connectors with a cable tie. Form a
drip loop with the three cables (see Connecting Cables to the TRH
, page25).
8. Secure the WIND, RAIN and DATA cables to the mast with cable ties.
9. Raise top section of mast and secure in place by inserting bolt(s) through aligned
holes in top and bottom section of mast. Tool-tighten the bolts.
10. Using a compass, confirm that the Wind Sensor’s black junction box is still pointing
South. If necessary, lower mast and rotate Wind Sensor so it faces South (see
below).
WIND SENSOR ORIENTATION
11. The 200' Data Cable is now ready to be routed inside the building. Plan your cable
route carefully. Make sure you know exactly where your cables will be before
committing to your route.
IMPORTANT: When routing cables and connectors, be careful not to damage or
strain them. Run the Data Cable in conduit across the length of the building and around
sharp corners (conduit not included).
Installing Outdoor Components (Continued)