Installation Guide

Arlington Aluminum Railing Installation Guide
We’re happy to help. Call 1-855-224-9761.
4
Note
The space between the bottom rail to the ground is 2.75", use a 2.75" high
piece of wood as a temporary support.
Pre-drill holes on the post to install the bracket.
When cutting the bottom rail, subtract 5/16” from each mark and cut from
both ends for even picket spacing.
The spacer size for each rail end is different. (A special round label will be used
to identify the end spacers.)
To ensure equal picket spacing at each post use the bottom rail as a template
to cut the first and last spacer.